EmbLinkRTOS Architecture, v0.2¶
This directory is the architecture baseline for EmbLinkRTOS. It supersedes the v0.1 PDF specification where it disagrees and otherwise builds on it.
Reading order¶
# |
Document |
What it answers |
|---|---|---|
00 |
What v0.1 got right, what was missing, what v0.2 changes and why |
|
01 |
Mission, what “modern” means here, principles, non-goals, positioning, definition of success |
|
02 |
Layers, responsibilities, concept vocabulary, dependency rules, execution contexts, profiles, native port, how a board arrives |
|
03 |
Execution model, scheduling classes and budgets, wait protocol, time, synchronization, IPC, objects and capabilities, partitions, memory, faults |
|
04 |
Hardware description pipeline, device and driver model, power, boot and update, security, observability, multicore, simulation, middleware |
|
05 |
API conventions, configuration and build, repository layout, verification, quality gates, traceability, release, support, documentation |
|
06 |
ADR-001 to ADR-040 with alternatives and consequences; ADR-004, ADR-024, ADR-025, ADR-026 to ADR-038 and the ADR-039 revision and ADR-040 tooling decision are accepted; older records retain their recorded statuses and subsequent specification refinements |
|
07 |
1.0 boundary, milestones M0 to M6+, specification work order, risks |
|
08 |
Decisions awaiting the project owner, each with a recommendation |
|
09 |
Verified EmbCC capabilities and limits per target, and the kernel rules that follow from them |
Status markers¶
LOCKED - established in v0.1 or confirmed here; changed only through a new ADR.
PROPOSED - new in v0.2; recommended, becomes LOCKED on review.
PLANNED - required capability; detailed design still to be written.
FUTURE - must not be precluded; not in 1.0.
Requirement identifiers¶
v0.1 groups continue their numbering (for example KRN-SCH-036 follows v0.1’s KRN-SCH-035). New groups introduced in v0.2:
KRN-MM memory ordering KRN-TP temporal protection
KRN-WAIT wait and wake protocol KRN-NOTIF notifications
KRN-WQ work queues KRN-CAP capabilities
KRN-OBJ object lifecycle KRN-PART partitions
FLT faults HW hardware description DRV drivers PWR power
BOOT boot/update SEC security (continues) OBS observability MC multicore
SIM simulation API API conventions BLD build TEST verification (continues)
REL release SUP support levels
Requirements move into docs/requirements/ as structured files group by group, as each specification work item lands; the format guide and group index are in docs/requirements/README.md, and the first migrated group is API. Detailed designs live in docs/specs/. The architecture documents cite requirements rather than restate them once a group has moved.
Phase¶
M1 kernel execution is implemented; M2 remains incomplete. Native, AVR, Cortex-M3/M4F, and RV32IMAC ports exist, with embedded conformance configured under QEMU. Hardware latency, isolation, budgets, the hardware generator, and complete observability remain outstanding. Read Project status for the authoritative implementation and evidence inventory and the roadmap for delivery gates.